Key takeaways
- The process starts with an inspection and a clear scope.
- Tear-off exposes the deck so repairs can be made.
- Underlayment, flashing and roofing go on in a set order.
- Cleanup includes a magnet sweep for nails.
Inspection and proposal
A roofer inspects the roof and attic, measures the roof and discusses materials. A good proposal lists the scope, materials, colors and how problems like rotten decking will be handled.
Ask questions and review samples.
Preparation
Materials are scheduled, landscaping and equipment are protected, and a dumpster or trailer is placed for debris.
You may need to move vehicles and items near the house.
Tear-off and installation
Old roofing is removed and the deck is inspected and repaired. Underlayment, ice and water barrier, drip edge, flashing, shingles or metal and ridge caps are installed in order.
Vents and penetrations are flashed.
Final inspection and cleanup
The crew checks the roof, sweeps the yard for nails, hauls away debris and walks the finished roof with you.
Keep your paperwork and photos.
Quick answers
How long does a roof replacement take?
Many homes take a few days, depending on size, pitch, material and weather.
Do I need to be home?
It helps to be reachable, but you do not have to be home.
What if it rains?
Crews dry in the roof so the house stays protected, and they reschedule when weather is unsafe.